Blog Preview

Fire Safety Systems

Applicable to: All Indian seafarers and companies
Effective Date: 01.09.2012 to 30.11.2012
Superseded Circulars: None mentioned

Key Changes and Requirements

1. Campaign Details

A concentrated inspection campaign (CIC) on fire safety systems will be held from 01.09.2012 to 30.11.2012.

  • Purpose: To ensure compliance with SOLAS Chapter II-2 (Fire protection, fire detection, and fire extinction arrangements).
  • Duration: 3 months

2. Inspection Process

During the campaign, Port State Control Inspections will verify fire safety arrangements, maintenance records, and other applicable documentation in detail.

  • Checklist: A checklist of 12 selected items will be used to verify critical areas for shipboard fire safety systems.
  • Availability: The checklist will be available on the IOMOU Ocean MoU website (http://www.iomou.org) about a month prior to the campaign.
II/4  Checklist items will cover documentation, equipment, and crew familiarization.
Important Note

Indian PSC Officers will be required to upload the CIC checklists filled during the inspections while uploading PSC reports.

Download official PDF

Want to learn and share your knowledge about the maritime world?

Explore the Blog app on Navvyx - Get maritime insights from across the world in one place.