Grounding of General Cargo vessel Flag - Foreign, in Indian waters., A General Cargo vessel, built in - 1997
Applicable to:
Masters and Pilots
Effective Date:
29.09.2009
Superseded Circulars:
None
Key Changes and Requirements
1. Incident Narrative — General Cargo vessel grounding
A General Cargo vessel, built in 1997, GRT - 5002, with two cargo holds, flag - foreign, loaded with 6273 cbm of round logs arrived at an Indian port on 23.5.2009. The vessel experienced a series of incidents leading to grounding on 25.5.2009.
- Date: 25.5.2009
- Time of grounding: 1955 hrs.
- Location: Western bank of the port
2. Observations and Recommendations
II/4 Prudent use of tugs and proper ship handling skills are essential during ship maneuvers.
- Recommendations: Masters and Pilots should ensure proper exchange of information, use of tugs, and comply with chart requirements (SOLAS Chapter V).
- Port Authority: Provide timely assistance, adequate tugs, and ensure compliance with reporting requirements (M.S. Act, 1958).
Important Note
All Masters and Pilots are advised to comply with the recommendations to prevent similar incidents.