Blog Preview
Interim Guidelines for the safe operation of Onshore Power Supply in port
**Summary for Indian Seafarers: DGS Circular 9 of 2024 - Interim Guidelines for Safe Onshore Power Supply**
Applicable to:
All Indian Ports, Shipowners, and Seafarers
Effective Date:
10 April 2024
Superseded Circulars:
None
Key Changes and Requirements
1. Purpose and Scope
This circular provides interim guidelines for the safe operation of onshore power supply (OPS) in Indian ports.
- Applicable: All Indian ports, shipowners, and seafarers.
- Not Applicable: Electrical power supply during docking periods.
2. Compliance and Responsibilities
All stakeholders should comply with these guidelines and ensure their personnel are adequately trained and familiar with the procedures.
- Responsible Parties: Port authorities, shipowners, and seafarers.
- Compliance Deadline: Immediate effect from the date of issue (10 April 2024).
3. Key Requirements and Procedures
Key requirements and procedures include:
- Compatibility Assessment: Ensure compatibility between ship and shore installations before connecting.
- Pre-connection Checklist: Complete a pre-connection checklist before connecting to shore power.
- Safety Procedures: Follow safety procedures during connection, disconnection, and maintenance.
- Training: Ensure all personnel are adequately trained in OPS procedures.
II/4 DGS Website for more information.
Important Note
Non-compliance may result in penalties and safety risks. All stakeholders are advised to familiarize themselves with these guidelines and ensure compliance.
Want to learn and share your knowledge about the maritime world?
Explore the Blog app on Navvyx - Get maritime insights from across the world in one place.