Blog Preview
Work Boats in lieu of Rescue boats
Applicable to:
Owners / Managers of Tugs and other vessels under Class XII
Effective Date:
25.02.2011
Superseded Circulars:
NT/LSA Circular 7 of 2006
Key Changes and Requirements
1. Exemptions and Requirements
The DGS grants exemptions from carrying rescue boats on certain vessels, based on their length, gross tonnage, and area of operation.
- Class XII vessels <24m, <500GT: Exempt from rescue boat if operating within major/minor port limits.
- Class XII vessels <24m, <500GT without rescue boat: Need voyage permission for cargo/tow during foul weather season.
- Class XII vessels 24m-85m, <500GT: Fit work boat/davit in lieu of rescue boat for coastal/territorial waters (up to 20NM from land).
2. Work Boat Specifications and Requirements
Work boats must meet specific requirements, including seaworthiness, capacity, and launch/recovery time.
- Launching: Within five minutes, with a system that meets SOLAS requirements if freeboard constraints exist.
- Capacity: Adequate room for 2-3 crew members and 1 person in a stretcher.
- Training: Crew training is crucial for successful rescue operations.
II/4 Recommended Specifications for Work Boats
Important Note
Vessels must comply with the new requirements by 31st July 2011, or the next scheduled dry-dock if freeboard is over 900mm.
Want to learn and share your knowledge about the maritime world?
Explore the Blog app on Navvyx - Get maritime insights from across the world in one place.