Blog Preview

Unified Interpretations to Resolution MEPC.159(55),For existing ships, new installations with a contractual delivery date to the ship on or after 1 January 2010 or, in the absence of a contractual delivery date

Applicable to: All Indian seafarers and ship owners
Effective Date: 1st December 2010
Superseded Circulars: Engineering Circular No. 120/2010

Key Changes and Requirements

1. Interpretation of Resolution MEPC.159(55)

The IMO has unified the interpretation of Resolution MEPC.159(55) for new and existing ships.

  • New Ships: Installations must be made on ships with keels laid or at a similar stage of construction on or after 1 January 2010.
  • Existing Ships: New installations must have a contractual delivery date to the ship on or after 1 January 2010, or the actual delivery of the equipment to the ship on or after this date.
Note:  This circular supersedes Engineering Circular No. 120/2010.
Download official PDF

Want to learn and share your knowledge about the maritime world?

Explore the Blog app on Navvyx - Get maritime insights from across the world in one place.